Structural repairs, run from survey to sign-off
Underpinning, crack-stitching, resin injection and structural repairs — Field 2 Service carries each job from survey to sign-off: quote, take a deposit on the job, schedule the works, and stage the invoices as the job progresses.
✓ No card required · ✓ Invoiced by bank transfer

Sound like your workload?
Structural repair is survey-heavy, warranty-backed and paid in stages — three things a paper diary handles badly.
Surveys that go cold
A survey report and a rough price, then weeks of silence. Without a live pipeline the quote drifts, the deposit never lands, and the job stalls before the props go in.
Priced and billed in one lump
Underpinning and structural works run over weeks, but the quote's a single figure — so every stage payment means digging out the calculator and hoping the numbers still add up.
Guarantees lost in a drawer
You back the work for years, but the proof — what system went in, where, and when it was signed off — is scattered across job bags and old emails when a warranty claim lands.
One thread from the survey to the last stage
Book the survey, quote from your price book (Essentials and up) — piles, resin, beams, needling and labour — take a deposit on the job and schedule the works, all on the same job in order. The customer accepts the quote online, expiry tracking nudges the ones sitting on the fence, and nothing gets re-keyed between visits.
- Survey, quote and works stages on one job
- Deposit on the job up front before you order steel or resin
- Online acceptance with quote expiry tracking

Plan every gang across properties on one board
Lay the works out across days and crews on the Smart Dispatch board (Professional and up). Drag a gang to another property when access slips, and the conflict check keeps you from promising the same crew to two sites at once. The certification guard flags anyone without the ticket the works demand before you assign them.
- Multi-day structural works on a drag-and-drop board
- Double-booking conflict checks across gangs and sites
- Certification guard blocks an out-of-ticket operative (Essentials and up)

Every property, the system that went in, and the guarantee behind it
Keep each property under the customer with its access notes and contacts, and log the installed system — helical piles, resin injection, wall ties, crack-stitching — on the asset register (Essentials and up) with its own service history. When a warranty claim or re-inspection comes in years later, the record is right there.
- Multi-site customers with per-property access notes
- Asset register with per-system service history
- Guarantees and installed systems recorded against the property

Checklists (Essentials and up) and sign-off, done in a phone browser
Work through a checklist as the works progress — props in, excavation depth, reinforcement, backfill, making good — and capture the customer's or engineer's signature on the completion sheet before the gang leaves. It's filed against the job with photos, your proof the stage was done and accepted.
- Checklists for props, excavation, pour and making good
- Signed completion sheets captured on site
- The field view runs in any phone browser — no app to install

Invoice each stage, chase the slow accounts automatically
Bill each stage as it signs off with a VAT-smart invoice and a card-payment link (Essentials and up; connect your own Stripe or PayPal). The deposit's applied automatically, per-line VAT rates keep registered work straight — one clean Price if you're not registered — and automatic reminders plus an aged-debtors view show exactly which builder is behind.
- Stage invoices with card links via Stripe or PayPal
- VAT-smart per-line rates — or one clean Price if not registered
- Automatic reminders and an aged-debtors view

Built-ins structural crews lean on
Put the office on solid ground
Try Field 2 Service free for 14 days — survey a job, quote, take a deposit on the job, stage the invoices. No credit card required.
Get startedOr see the other trades we're built for.